Backed by Mark Cuban

MMC

Grammarly for construction drawings.

An invisible audit layer that catches drawing errors before they become rework, delays, and claims. View and manage issues in the tools you already use — drag-and-drop, or audit files directly in SharePoint, Autodesk, Trimble, Procore and more.

Featured in 👉

ASPE logo
MADE RIGHT logo
AIAEC logo
pinacle logo
DBIA logo
giri logo
Trimble Connect logo
Autodesk logo
ASPE logo
MADE RIGHT logo
AIAEC logo
pinacle logo
DBIA logo
giri logo
Trimble Connect logo
Autodesk logo

100,000+ Sheets Audited | Never miss a callout again | Processed project files purged on a published schedule (see Privacy — 14-day purge). | Risk-free use guarantee

Click to see what we do 👇

1. You upload PDF drawings.

2. QC the set — Bluebeam-ready findings in minutes.

3. View issues as a PDF.

Workflow quality-check screen
Gordon Highlander logo
WRC Consulting logo
Armony Construction logo
MidHudson CM logo
APDG Architects logo
AWIP logo
Gordon Highlander logo
WRC Consulting logo
Gordon Highlander logo
WRC Consulting logo
Armony Construction logo
MidHudson CM logo
APDG Architects logo
AWIP logo
Gordon Highlander logo
WRC Consulting logo

PDF in. Audited PDF out. You never leave your tools.

MarkedUp is an intelligent invisible layer inside the tools you already trust. While others provide a "first-pass," MarkedUp provides a final audit.

  1. Step 1: Drop in your PDF set

    Upload your architectural, structural, and MEP drawings. We handle the heavy lifting.

  2. Step 2: View your MarkedUp PDF

    We export all found issues as standardized markups directly into a PDF opened in Bluebeam, Autodesk, Procore, or wherever you manage PDFs today.

  3. Step 3: Bid and build better

    Your team resolves them exactly as they do today, just without the 40 hours of manual searching.

Direct integrations with 👉

Autodesk Forma logo
Bluebeam Session logo
Google Drive logo
Microsoft SharePoint logo
Procore logoComing soon
Trimble ProjectSight logo
Trimble Connect logo
Model Context Protocol logo
Autodesk Forma logo
Bluebeam Session logo
Google Drive logo
Microsoft SharePoint logo
Procore logoComing soon
Trimble ProjectSight logo
Trimble Connect logo
Model Context Protocol logo

One missed callout costs $70,000.
A MarkedUp audit costs a fraction of that.

You are not buying software. You are buying a final audit that catches the silent errors before they reach the field.

Dont like the results? Full refund guaranteed on pay-per-audit.

Cost Of One Error

$100K+

Rework, procurement, delays

VS

Annual Subscription

$5,000

Per office per year. Unlimited.

MarkedUp pays for itself the first time it catches a single error.

Drawing errors are inevitable. Find them before you bid, build or share with markedup.ai.

Whether you issued the set or you're about to build from it undetected errors cause the same damage: rework, RFIs, back-charges, and blown schedules.

  • Precon & Estimating

    Dont lock your GMP on uncoordinated bid sets.

    • Catch missing details before subcontractors issue exclusions.
    • Audit massive bid sets in minutes during the bidding crunch.
    • Protect your fee from day-one, easily avoidable change orders.
  • Architects

    Elevate QA/QC standards without adding billable hours.

    • Callout references to moved/deleted details
    • Sheet indexes out of sync.
    • Door schedule mismatches.
  • VDC/BIM Managers

    you're drowning in coordination.

    • Broken callout references nobody flagged.
    • Sheet index drift that creates scope gaps.
    • Door schedule mismatches that become procurement emergencies.
  • GC Ops teams

    Protect project margins by catching coordination gaps.

    • Prevent field RFIs caused by dead-end callouts.
    • Eliminate scope gaps hidden in misaligned sheet indexes.
    • Stop wrong material orders due to plan-to-schedule mismatches.

The specific checks that protect your margin, your schedule, and your legal baseline.

  • Audit Check 01:

    Sheet Index Alignment.

    Your Contractual Baseline, Verified.

    Without: 5 undetected sheets built from disputed bid arbitration.
    With: 5 undetected sheets flagged. Legal baseline clean.
  • Audit Check 02:

    Missing Callouts & Details.

    Stop The Domino Effect.

    Without: Sub Improvises. Inspection fails. Rework: $73K.
    With: Broken ref flagged pre-con. Architect corrects. Cost: $0.
  • Audit Check 03:

    Door Schedule-To-Plan Sync.

    Prevent The Procurement Disaster.

    Without: Wrong door ordered. 14-wk lead time. $5K/day LD.
    With: Mismatch flagged before PO. Order once. On-time.
  • Audit Check 04:

    Keynote-To-Legend Verification.

    Every Note On Every Sheet, Accounted For.

    Without: Missed note drives area demo. $40K+ in extra labor and haulage.
    With: Orphaned keynote flagged during audit. Added scope to the bid.
Audit Checks ->Sheet Index OKCallouts OKDoor Schedules OKKeynotes OKWindow Schedules - SoonP&ID - SoonFinish Schedules - SoonElectrical OK

Other tools offer a first-pass. markedup.ai provides a final audit.

Generic LLMs hallucinate, and basic construction AI tools only scan text. markedup.ai reads drawing geometry, symbols, and cross-sheet references — then returns Bluebeam-ready findings.

FeatureManual QA/QCGeneric AI (ChatGPT)markedup.ai
AEC ContextHigh (Human)Low (Hallucinates)High (AEC-Trained)
PDF ProcessingHours/DaysText Only (No Vector)Fast · Vector-native
Data PrivacyInternal OnlyPublic Training DataNo training on your project files.
Output TypeHand RedlinesChat TextBluebeam-Ready PDF

Customer drawing audits — integrity findings before bid.

See how GCs use markedup.ai to catch door-schedule and callout risks before bid — without a new drawing system.

  • AWIP logo

    Preventing Procurement Errors & Schedule Delays

  • Gordan Highlander logo

    Gordon Highlander — $100K window

  • Midhudson CM logo

    MidHudson CM — $54K change order

The story behind MarkedUp.

MarkedUp founder with family

As a construction engineer, I watched my wifes brother lose $100,000 on a single project because of errors nobody caught. I built MarkedUp so nobody, architect or GC, ever absorbs that loss again.

Christopher J Mouflard, Founder and CEO, MarkedUp

Frequently Asked Questions

markedup.ai is Grammarly for construction drawings — an invisible audit layer that catches drawing errors before they become rework, delays, and claims.

Headless means you never have to move drawings into a new system of record. markedup.ai audits inside the tools you already use and returns marked-up results there.

ConstructionProof is the drag-and-drop path: upload a PDF drawing set, get a marked-up PDF back. No integration work, no IT project, no new UI to learn.

Native folder-listening integrations include Trimble Connect, Trimble ProjectSight, Autodesk Forma, Google Drive, and SharePoint.

High-risk drawing rules including sheet index alignment, callouts and details, door schedules, keynotes, and MEP — across large multi-thousand-page sets.

By the silence principle: it stays quiet until it finds an issue, then alerts via email, Slack, Microsoft Teams, or in-app — only when there is something worth acting on.

Pre-construction, construction, and architecture firms roughly in the $100M–$1B annual range (also EPC and owner-side capital programs).

No. It is not a DMS and not a dashboard product. If value lived behind a login you have to remember to check, it would have failed the headless test.

Risk-free use guarantee | Rework Risk Reduction | Secure Payment | Processed project files purged on a published schedule (see Privacy — 14-day purge). | Encryption in transit & at rest